Impact Mining Equipment

1600m² warehouse and two storey office facility, totaling to a floor area of 2051 m².

Summary
  • Client

    Impact Mining

  • Sector

    Mining Equipment

  • Location

    Mayfield West

  • Products

    Precast Panels

Scope

Impact Mining Equipment constructed their new warehouse and office facility, relocating from their original premise. Hunter Precast worked with GWH and Hunter Structural Steel to erect the structure within the tight build window.

Details

  • 113 precast elements
  • 7,786m2 @ 100mm

Products

  • Wall Panels

Partner with us on your next project

Contact our specialised team for more information about our products and how we can meet your specifications.

Our Projects

Murray Dwyer

This Drayton development in the Steel River Industrial Estate consisted of 340 precast panels at a whopping 4,892 sqm. Panel thicknesses ranged from 100mm to 200mm.

Waterview

Located in Belmont with stunning views across Lake Macquarie. Constructed over 3 levels with 1 floor of basement parking the structure comprised of precast concrete panels on structural steel, framed around a central lift shaft.

Menu