The Electrodry complex offers four storeys of storage spaces, 570 storage units and office suites located at the front. Our innovative design saw cladding panels clipped to temporary propped columns to achieve a handrail before each proceeding floor. 400mm columns and a total of 3,125 sqm of cladding.
ONE Apartments
Hunter Precast was proud to supply 2,170 precast panels, covering an impressive 19,784m², to the landmark ONE Apartments development in Newcastle West. As the largest project ever undertaken by Hunter Precast, this build demonstrates our capacity to deliver high-volume, high-complexity precast solutions at scale.
Our scope included façade, core, balustrade, and column panels, combining architectural design with robust structural performance across the tower’s mixed-use residential and commercial levels.
The project involved:
-
95 installation campaigns from November 2023 to April 2025
-
4,221m³ of concrete (≈10,341 tonnes)
-
404 tonnes of complex reinforcement cages
-
151 km of stock bar
-
115 pallets of grout (48 bags each), installed by hand
The result is a striking addition to Newcastle’s skyline, setting new standards in precision and quality for large-scale precast delivery.