Consisting of 2 stages, this industrial build in Beresfield NSW, was completed in early 2024.
Canavan Dr Beresfield
- 2,216m2 of Precast Panels
- 135 panels in total
- 264m3 of concrete
- 4,800m of N12 rebar

We value individuals and their contribution – everyone here takes great pride in what we do. We bring our knowledge, skills and foresight to anticipate what’s needed on the job to overcome challenges, maximise efficiency, maintain safety and deliver the highest quality.
Here are just some of the people that make it all possible.







Everyone’s important to us, and we value everyone’s contribution to ensure success.
Our precision-planning skills anticipate what’s needed to overcome challenges, maximise efficiencies, maintain safety and deliver the highest quality.
Our can-do attitude and flexibility ensure the right solutions to help keep projects on track.
We bring people together inside and outside of our business to create smooth and seamless project outcomes.
We love planning the sequencing and managing even the most complex projects to maximise efficiencies.






Consisting of 2 stages, this industrial build in Beresfield NSW, was completed in early 2024.
Hunter Precast was proud to supply 2,170 precast panels, covering an impressive 19,784m², to the landmark ONE Apartments development in Newcastle West. As the largest project ever undertaken by Hunter Precast, this build demonstrates our capacity to deliver high-volume, high-complexity precast solutions at scale.
Our scope included façade, core, balustrade, and column panels, combining architectural design with robust structural performance across the tower’s mixed-use residential and commercial levels.
The project involved:
95 installation campaigns from November 2023 to April 2025
4,221m³ of concrete (≈10,341 tonnes)
404 tonnes of complex reinforcement cages
151 km of stock bar
115 pallets of grout (48 bags each), installed by hand
The result is a striking addition to Newcastle’s skyline, setting new standards in precision and quality for large-scale precast delivery.