Consisting of 2 stages, this industrial build in Beresfield NSW, was completed in early 2024.
1600m² warehouse and two storey office facility, totaling to a floor area of 2051 m².
1600m² warehouse and two storey office facility, totaling to a floor area of 2051 m².
Impact Mining
Mining Equipment
Mayfield West
Precast Panels
Contact our specialised team for more information about our products and how we can meet your specifications.
Consisting of 2 stages, this industrial build in Beresfield NSW, was completed in early 2024.
8 storey, 79 bedroom, 81 car spaced building with two podium level terraces. Located in Wickham, and built by GWH alongside Hunter Structural Steel, Hunter Install and Hunter Windows.