Wyee Shopping Village

With anchor store FoodWorks, the new Wyee Shopping Village is a welcome community addition.

Summary
  • Client

    GWH

  • Sector

    Commercial

  • Location

    Wyee

  • Products

    Precast Panels

Scope

Working with GWH and the wider Hunter Construction Group, the new Wyee Shopping Village was completed in September 2021 and covers over 5,000 square metres.

Details

  • 192 precast elements
  • 2,522m2 @ 100mm

Products

  • Wall Panels

Partner with us on your next project

Contact our specialised team for more information about our products and how we can meet your specifications.

Our Projects

Murray Dwyer

This Drayton development in the Steel River Industrial Estate consisted of 340 precast panels at a whopping 4,892 sqm. Panel thicknesses ranged from 100mm to 200mm.

Millhorn

8 storey, 79 bedroom, 81 car spaced building with two podium level terraces. Located in Wickham, and built by GWH alongside Hunter Structural Steel, Hunter Install and Hunter Windows.

Menu